One of the greatest challenges in installation was that many of the ponds we worked on could not be pumped dry.
Lakes 5A and 5
required a HDPE lined pond with a stainless steel batten attachment around
the perimeter. |
|
|
While this lake could be de-watered,
due to limited water storage on site, that wasn’t always the case. |
Nonetheless, GSI completed
the project on time, and on budget. |
|
|
In Lake # 6 the approach taken
was to install a floating cover over the water using 40 mil PVC, then
sink it by pumping water from below the liner to on top of it. |
Several other lakes at this
exclusive development were lined including Lakes 2, 7, 8, 11, and 14.
Just another example of how GSI excels where others fail. |
|
|
When the Tuscany Reserve community is completed, GSI's quality installation will demonstrate our ability to complete complex projects that enable landscape architects transform their ideal designs into reality.
|