One of the greatest challenges in installation was that many of the ponds we worked on could not be pumped dry.

Lakes 5A and 5 required a HDPE lined pond with a stainless steel batten attachment around the perimeter.

Click for a Full Size image.

Click for a Full Size image.

While this lake could be de-watered, due to limited water storage on site, that wasn’t always the case.
Nonetheless, GSI completed the project on time, and on budget.

Click for a Full Size image.

Click for a Full Size image.

In Lake # 6 the approach taken was to install a floating cover over the water using 40 mil PVC, then sink it by pumping water from below the liner to on top of it.
Several other lakes at this exclusive development were lined including Lakes 2, 7, 8, 11, and 14. Just another example of how GSI excels where others fail.

Click for a Full Size image.

When the Tuscany Reserve community is completed, GSI's quality installation will demonstrate our ability to complete complex projects that enable landscape architects transform their ideal designs into reality.